This project was done while under contract with Architectural Iron Company, a Premier Restoration Company. The project was to reproduce two flag cases that were removed back in the seventies to make room for tours within the tomb. I was given two grainy black and white photographs. One was of the base of the case, and the other was of the top of the case. Also, I was told that a stain in the marble floor would give me the base width and shape. This project was a challenging assignment and was the biggest multi-cased piece I have ever been involved in.
BACK TO MISCELLANEOUS METALS, DESIGN & DETAILING |